『The Home Project Podcast』のカバーアート

The Home Project Podcast

The Home Project Podcast

著者: Tina Patel & Bart Kolosowski
無料で聴く

今ならプレミアムプランが3カ月 月額99円

2026年5月12日まで。4か月目以降は月額1,500円で自動更新します。

概要

The Home Project Podcast helps homeowners navigate the complex world of architecture and construction with clarity and confidence.

Hosted by architect Tina Patel and quantity surveyor Bart Kolosowski, the show breaks down how residential projects really work — from early ideas and budgeting, through design, planning, procurement, construction, and handover.

Each episode explains the risks, terminology, and decisions that shape outcomes, translating industry knowledge into plain English. The goal is simple: to help you avoid costly mistakes, make informed decisions, and run a calmer, more predictable home project.

Whether you’re planning an extension, renovation, or full refurbishment, this podcast gives you the insight professionals use every day — without the jargon, confusion, or horror stories.

Copyright 2025 All rights reserved.
エピソード
  • Planning Permission for Homes: Delays, Risks and How to Beat Them
    2026/04/23

    What if you could see every planning delay coming?

    The delays most homeowners fear are more predictable than they think.

    We sit down with Geoff Megarity, planning consultant at Bell Cornwell, to map out exactly where delays hide and what you can do to get ahead of them. From the validation checklist to ecology survey seasons, Geoff explains the preparation that separates a smooth five-month process from one that drags on for eighteen.

    We cover how to build a validation checklist that gets your application through the door, when pre-application meetings are worth the time, how to challenge planning conditions before they slow your build, and how a simple red, amber, green framework can help you assess risk at every stage.

    The right preparation means you go into construction with the right permission, the right conditions, and no costly surprises on the other side.

    “Death by survey is something that comes up quite often.” - Geoff Megarity

    You’ll hear about:

    • How the planning system creates delay
    • Why validation is the first real hurdle
    • Reports that are mandatory versus optional
    • Ecology surveys and seasonal timing risks
    • Biodiversity net gain and who it affects
    • How planning conditions add post-permission delay
    • Pre-commencement vs pre-occupation conditions
    • When pre-application meetings are worth it
    • How planning committees work and when to use them
    • Managing refusal risk and appeal strategy
    • Red, amber, green risk framework for homeowners
    • Banking a permission and amending later

    Connect with Geoff Megarity:

    Geoff Megarity at Bell Cornwell - https://www.bell-cornwell.co.uk/team/geoff-megarity/

    Bell Corwnell - https://www.bell-cornwell.co.uk/

    LinkedIn - https://www.linkedin.com/in/geoff-megarity-a075676a/

    Connect with us:

    Tima Patel - https://www.linkedin.com/in/tinapatel/

    Bart Kolosowski - https://www.linkedin.com/in/bartkolosowski/

    Produced by Between Tracks - https://www.betweentracks.com/

    続きを読む 一部表示
    1 時間 5 分
  • Is Permitted Development a Shortcut or a Risk for Homeowners?
    2026/04/16

    Do you really know what your permitted development rights allow?

    The rules are nationally set, locally interpreted, and full of conditions that can catch even experienced owners out.

    We cover what permitted development allows: extensions, loft conversions, outbuildings, and barn conversions. We explain where the rules get complicated, why the same street can have completely different rights, and how conservation areas, Article 4 directions, and historic planning conditions can strip those rights without you ever knowing.

    We also explore the fallback position strategy, how to use an established permitted development certificate as leverage in a full planning application, and why the certificate of lawfulness is worth getting even when it is not legally required.

    Get this wrong and you are building unlawfully. Get it right and you may have more options than you realised.

    “The onus is on the applicant to prove it’s lawful.” - Geoff Megarity

    You’ll hear about:

    • What permitted development rights actually cover
    • Rear extension limits: three, four, six and eight metres
    • Loft conversions: cubic volume limits explained
    • Outbuildings: the 50% garden rule
    • Why flats have no PD rights
    • Conservation areas and Article 4 directions
    • Finding the original building line
    • What a certificate of lawfulness does
    • The fallback position strategy in planning
    • What happens when enforcement comes knocking
    • Barn conversions under permitted development
    • Why early professional advice saves money

    Connect with Geoff Megarity:

    Geoff Megarity at Bell Cornwell - https://www.bell-cornwell.co.uk/team/geoff-megarity/

    Bell Corwnell - https://www.bell-cornwell.co.uk/

    LinkedIn - https://www.linkedin.com/in/geoff-megarity-a075676a/

    Connect with us:

    Tima Patel - https://www.linkedin.com/in/tinapatel/

    Bart Kolosowski - https://www.linkedin.com/in/bartkolosowski/

    Produced by Between Tracks - https://www.betweentracks.com/

    続きを読む 一部表示
    1 時間 2 分
  • Planning Permission Demystified: What Every Homeowner Needs to Know
    2026/03/27

    Is planning permission as frightening as everyone says?

    Planning is a black box where decisions are made arbitrarily, and outcomes are impossible to predict.

    We cut through the confusion with chartered town planner Aaron Zimmerman of Centro Planning Consultancy. We cover what constitutes development, the difference between permitted development and full planning permission, how the eight-week determination process works, and what your options are when a refusal lands.

    We also explore how to put together a strong application, when to bring in a planning consultant, how pre-application consultation works, and why a refusal is not the disaster most homeowners fear.

    Get the process wrong at the start and you risk wasted time, wasted money, and a project that never gets off the ground. Get it right and planning becomes the most manageable part of your build.

    “Go for gold. Get the planning permission." - Aaron Zimmerman

    You’ll hear about:

    • What legally counts as development
    • When listed building consent is required
    • How permitted development rights work
    • Full planning permission: the process
    • The eight-week determination timeline
    • What to do after a refusal
    • How to build a strong application
    • When to use a planning consultant
    • Pre-application consultation: pros and cons
    • How to choose the right architect
    • Why a refusal is not a disaster
    • Planning reform and the system's limits

    Connect with Aaron Zimmerman:

    LinkedIn - https://www.linkedin.com/in/aaron-zimmerman-ma-msc-mrtpi-83322b27/

    Listen to Aaron’s podcast - Make Planning Make Sense - https://makeplanningmakesense.captivate.fm/

    Centro Planning Consultancy - https://centroplan.co.uk/

    Connect with us:

    Tima Patel - https://www.linkedin.com/in/tinapatel/

    Bart Kolosowski - https://www.linkedin.com/in/bartkolosowski/

    Produced by Between Tracks - https://www.betweentracks.com/

    続きを読む 一部表示
    57 分
まだレビューはありません