• Temperature, Heat & Change of State | Unit 303 Phase 2
    2026/08/02

    Why can a pressurised hot-water system become so dangerous when pressure is suddenly released? In this episode of The Copper Connection Podcast, Chris Bailey explains the scientific principles behind temperature, heat and change of state for plumbing and heating apprentices.


    Covering Unit 303, Phase 2, Session 2, this episode supports the 9289 Plumbing and Domestic Heating Technician apprenticeship and helps learners prepare for the Scientific Principles assessment criteria:


    • AC 3.1: The relationship between Celsius and Kelvin temperature scales

    • AC 3.2: The principles associated with changes of state

    • AC 3.3: Sensible heat and latent heat in liquids and gases


    You will learn:

    • How to convert between Celsius and Kelvin

    • What ΔT means in heating and heat-loss calculations

    • How solids, liquids and gases change state through melting, evaporation, condensation and freezing

    • Why water expands when heated, freezes, and turns to steam

    • Why frozen water can split pipework

    • How pressure changes the boiling point of water

    • Why unvented cylinders, sealed systems, pressure-relief valves and safety cut-outs must be treated with respect

    • The crucial difference between sensible heat and latent heat

    • Why superheated water can flash rapidly into steam when pressure is released


    This is not abstract science for the sake of an exam. It is the knowledge behind the safety procedures, system design and commissioning decisions you will encounter throughout your plumbing and heating career.


    Follow The Copper Connection Podcast for practical, exam-focused support for plumbing, heating and building-services learners.

    Hosted on Acast. See acast.com/privacy for more information.

    続きを読む 一部表示
    23 分
  • The EPA Is Changing: What Plumbing Apprentices Need to Know
    2026/08/02

    EPA reforms are generating plenty of confusion across plumbing and building services education, but what has actually changed for current learners?

    In this episode, Chris Bailey breaks down the move from End-Point Assessment (EPA) to Apprenticeship Assessment and explains what it means in practice for:


    • City & Guilds 9289 Level 3 Plumbing and Domestic Heating Technician apprentices
    • City & Guilds Level 2 Plumbing learners
    • T-Level Building Services Engineering students
    • Tutors, assessors and employers supporting apprentices


    You will learn why the current ST0303 assessment model remains unchanged for existing plumbing apprentices, what the January 2026 9289 v1.2 update really means, and why T-Level BSE assessments are not affected by apprenticeship EPA reforms.

    Chris also tackles five common misconceptions, including whether assessments are moving earlier, whether colleges will now mark EPA work, and whether learners need to revise different content.


    For the free tutor resource pack and the EPA Change Navigator chatbot, visit:

    https://thecopperconnectionpodcast.co.uk/epa-changes

    Hosted on Acast. See acast.com/privacy for more information.

    続きを読む 一部表示
    12 分
  • Units That Actually Matter On Site – Unit 303 Electrical & Scientific Principles for Plumbing & BSE
    2026/07/27

    Struggling to connect Unit 303 "Electrical and Scientific Principles – Units of Measurement" with what you actually do on site? In this Phase 1 Unit 303 episode of The Copper Connection Podcast, Chris Bailey turns SI units and derived units into practical tools for UK plumbing and building services students.


    You'll start with the seven base SI units – metre, kilogram, second, ampere, kelvin, candela and mole – and see which ones matter most in everyday plumbing tasks. Then we dive into temperature (Celsius vs Kelvin), pressure and head (pascal, kilopascals, bar and static head), and capacity in litres and cubic metres. From there, we break down key derived units: area in m², volume in m³, velocity in m/s, and density in kg/m³, including water's expansion and why pipes can burst when it freezes.


    We'll also tackle the non-SI units you still meet on UK sites: imperial length and weight, old gas meters in cubic feet per hour, and BSP pipe thread sizes that mix inches with metric diameters.

    Ideal for T-Level BSE, Level 2 and Level 3 plumbing learners and apprentices revising Unit 303, this episode helps you use units confidently in drawings, calculations and commissioning – and turns "science" into something that feels site-ready.


    🔗 Handouts, worksheets and revision resources at thecopperconnectionpodcast.co.uk


    Follow The Copper Connection on Acast, Spotify, Apple Podcasts and YouTube, and share this episode with a mate who hates science but loves tools.


    electrical and scientific principles, unit 303 9289, 9289 phase 1 science, SI units plumbing, plumbing apprentice science revision, t level bse revision, city and guilds level 3 plumbing, ST0303 apprenticeship, T-Level building services engineering, copper connection podcast, Chris Bailey plumbing podcast

    Hosted on Acast. See acast.com/privacy for more information.

    続きを読む 一部表示
    15 分
  • Who’s In Charge On Site? Unit 304 Planning & Supervision for Plumbing & BSE Students
    2026/07/27

    Revising Unit 304 “Planning and Supervision” and still not sure who actually runs a job, who signs work off, or who can shut it down when it’s unsafe? In this Phase 1 episode of The Copper Connection Podcast, host Chris Bailey maps out the full construction team and key site visitors so T‑Level BSE and plumbing learners can finally see the bigger picture.


    You’ll walk through a realistic UK building project step‑by‑step – from the client and architect, through the project manager, clerk of works and quantity surveyor, down to the main contractor, site management team, trade supervisors and craft operatives. Then we introduce the inspectors and visitors who focus on safety and compliance: building control, water inspectors, health and safety inspectors and electrical services inspectors, plus delivery drivers and members of the public on or near site.


    Perfect for T‑Level Building Services Engineering, Level 2 and Level 3 plumbing students, and UK apprentices revising construction team roles and responsibilities for Unit 304, this episode turns your handouts into a story you can remember and use in exam answers and on site.


    Follow The Copper Connection on Acast, Spotify, Apple Podcasts and YouTube, and share this episode with a course‑mate or fellow apprentice who needs to tighten up their planning and supervision knowledge before assessment.

    Hosted on Acast. See acast.com/privacy for more information.

    続きを読む 一部表示
    18 分
  • Sign Your Name to It — Commissioning and Handover of Cold Water Systems | Unit 310 9289 Phase 3
    2026/07/19

    The Copper Connection Podcast – Season 2, Episode 79, Sign Your Name to It — Commissioning and Handover of Cold Water Systems | Unit 310 Phase 3.


    There's a moment at the end of every job where the customer looks at you, not the boiler — because they're about to trust something you built. That's what commissioning is really about.

    In this episode, host Chris Bailey covers Unit 310 of the 9289 City & Guilds Level 3 Diploma in Plumbing and Domestic Heating — Phase 3, Session 1: commissioning and handover of cold water systems, steps 2 through 5.


    Chris covers:

    ✅ The full 11-step commissioning procedure, in order, and why the sequence matters

    ✅ The visual inspection checklist — open ends, connections, supports, valves, cisterns, FOVs

    ✅ Marking and labelling pipework — and the Category 5 water rule for rainwater harvesting and greywater reuse

    ✅ Filling and venting at normal operating pressure

    ✅ The soundness test explained in full — Water Regulations 1.5 × MOP, WRAS G12.2 and R12.2

    ✅ The BS EN 806 calculation cleared up: MDP = 1.5 × MOP, test pressure = 1.1 × MDP = 1.65 × MOP

    ✅ The full metallic pipe test procedure — 90 minutes total, zero pressure drop allowed

    ✅ Test A and Test B for plastic pipework — the exact figures you need

    ✅ Full Worksheet 1 walkthrough with the worked pressure calculation


    This episode is essential listening for:

    — Plumbing apprentices on the ST0303 Level 3 standard working through Phase 3

    — T-Level Building Services Engineering learners

    — Anyone preparing for the 9289 Phase 3 practical assessment and portfolio evidence

    🔗 Handouts, worksheets and revision resources at thecopperconnectionpodcast.co.uk


    Next episode: Unit 310 Phase 3 Session 2 — Flushing, disinfection, operational checks, documentation and handover.


    commissioning cold water systems, BS EN 806 explained, soundness test water regulations, WRAS guidance testing, plastic pipe test A test B, unit 310 9289, plumbing apprentice phase 3, city and guilds level 3 plumbing, ST0303 apprenticeship, T-Level building services engineering, copper connection podcast, Chris Bailey plumbing podcast, rainwater harvesting category 5 water


    • 9289 phase 3
    • commissioning and handover
    • 9289 domestic plumbing and heating
    • cold water systems
    • cold water systems in plumbing
    • uk construction theory
    • study tips for construction students
    • mastering plumbing theory
    • building services engineering
    • educational resources for plumbing
    • masterclass in plumbing
    • plumbing apprentices
    • plumbing revision guide
    • plumbing study resources
    • technical skills in construction


    Hosted on Acast. See acast.com/privacy for more information.

    続きを読む 一部表示
    18 分
  • Fill It, Test It, Flush It, Soundness Testing Central Heating Systems the Right Way Unit 309 9289 Phase 3
    2026/07/19

    The Copper Connection Podcast – Season 2, Episode 78, Fill It, Test It, Flush It, Soundness Testing Central Heating Systems the Right Way Unit 309 9289 Phase 3


    Ever watched a customer's face when the pressure gauge holds steady after a two-hour soundness test? That's the moment the job goes from "nearly finished" to "properly done."

    In this episode, host Chris Bailey covers Unit 309 of the 9289 City & Guilds Level 3 Diploma in Plumbing and Domestic Heating Phase 3, Session 1: filling, venting, soundness testing, flushing, and chemically treating central heating systems.


    Chris covers:

    ✅ The seven information sources you need before touching a system — Water Regs 1999, Building Regs Part G and L, BS EN 806, BS 8558, BS EN 12828, BS EN 14336

    ✅ Notifying the relevant person and the pre-fill visual inspection

    ✅ Staged filling, bleeding technique, and why overfilling triggers the pressure relief valve

    ✅ The BS EN 14336 soundness test standard — 30% above working pressure, minimum two hours

    ✅ The full 8-step preparation procedure and hydraulic testing method

    ✅ Cold flush, hot flush and power flush — what each one does and when to use it

    ✅ System additives: cleanser, descaler and inhibitor — dosing, application, and why magnetite sludge is the number one cause of premature boiler failure

    ✅ Full Worksheet 1 answers, including the filling loop procedure and sludge impact question


    This episode is essential listening for:

    — Plumbing apprentices on the ST0303 Level 3 standard working through Phase 3

    — T-Level Building Services Engineering learners

    — Anyone preparing for the 9289 Phase 3 practical assessment or portfolio work

    🔗 Handouts, worksheets and revision resources at thecopperconnectionpodcast.co.uk


    Next episode: Unit 310 Phase 3 — Commissioning and handover of central heating systems.


    soundness testing central heating, BS EN 14336, central heating inhibitor, power flush explained, cold flush hot flush, magnetite sludge boiler, unit 309 9289, plumbing apprentice phase 3, city and guilds level 3 plumbing, ST0303 apprenticeship, T-Level building services engineering, copper connection podcast, Chris Bailey plumbing podcast, Fernox Sentinel inhibitor dosing


    • central heating systems
    • 9289 phase 3
    • 9289 domestic plumbing and heating
    • soundness testing
    • central heating systems guide
    • central heating principles
    • uk plumbing revision
    • technical qualifications uk
    • student resources for plumbing
    • 5 pillar process
    • bse systems
    • building services engineering
    • masterclass in plumbing education
    • uk plumbing revision tips


    Hosted on Acast. See acast.com/privacy for more information.

    続きを読む 一部表示
    21 分
  • Gas, Pressure & Why Your Boiler Does What It Does — Scientific Principles for Plumbing Apprentices Unit 303 Phase 2
    2026/07/12

    The Copper Connection Podcast – Season 2, Episode 77, Gas, Pressure & Why Your Boiler Does What It Does — Scientific Principles for Plumbing Apprentices Unit 303 Phase 2.


    Ever watched the pressure gauge on a sealed heating system climb as the boiler fires up — and wondered why?


    That's not a fault. That's science. And once you understand it, you stop guessing and start knowing.


    In this episode, host Chris Bailey takes you through the complete properties of gases content for Unit 303 of the 9289 City & Guilds Level 3 Diploma in Plumbing and Domestic Heating — AC2.7 and the gas laws — in plain English, with real trade context throughout.


    This is Session 1 of the Phase 2 Unit 303 Scientific Principles series, and it covers the six principal gases you'll work with in building services — plus the two gas laws every plumbing and heating engineer needs to understand.


    Chris covers:

    ✅ Air — composition (78% nitrogen, 20.9% oxygen), uses in building services including combustion, pressure testing, and expansion vessels

    ✅ Steam — the pressure/boiling point relationship, why water flashes to steam at 1,600x its volume, and the safety implications for unvented systems

    ✅ Natural gas — constituents, methane CH4 at 90%, calorific value, relative density 0.58 (lighter than air — rises), flammable limits 5–15%, LEL and HEL

    ✅ LPG — butane vs propane, calorific values, relative density 1.5 (heavier than air — SINKS), flammable limits, why LPG installation differs from natural gas

    ✅ Carbon dioxide — pipe freezing kits, fire extinguishers, CO vs CO2 combustion

    ✅ Refrigerant gases — the vapour compression refrigeration cycle and how heat pumps work

    ✅ Charles's Law — volume and temperature at constant pressure, Kelvin scale, gas tightness testing temperature stabilisation

    ✅ Boyle's Law — inverse pressure-volume relationship, expansion vessel calculations

    ✅ Pressure units — Pa, bar, mbar, kPa, and when you use each one on site


    This episode is essential listening for:

    — Plumbing apprentices on the ST0303 Level 3 standard working through Phase 2

    — T-Level Building Services Engineering learners (Year 1 and Year 2)

    — Anyone sitting the 9289 Phase 2 exam who finds the science sessions challenging

    — Learners working through Unit 303 AC2.7 and AC4 content


    The science explains the trade. This episode makes it click.

    🔗 Handouts, worksheets, and revision resources at thecopperconnectionpodcast.co.uk


    Next episode: Unit 303 Phase 2 Session 2 — Energy, heat and power. Latent heat, sensible heat, change of state, and why condensing boilers are more efficient than conventional ones.


    properties of gases plumbing, Boyle's Law plumbing, Charles's Law explained, natural gas properties, LPG vs natural gas, relative density gas, calorific value natural gas, unit 303 scientific principles, 9289 phase 2 science, plumbing apprentice science revision, refrigerant gases heat pump, vapour compression cycle, steam properties plumbing, gas tightness testing temperature, pressure units bar pascal, city and guilds level 3 plumbing, ST0303 apprenticeship science, T-Level building services engineering, copper connection podcast, Chris Bailey plumbing podcast

    • scientific principles
    • electrical and scientific principles
    • 9289 phase 2
    • 9289 domestic plumbing and heating
    • technical skills in construction
    • technical qualifications uk
    • student resources for plumbing
    • plumbing revision masterclass
    • plumbing exam tips
    • level 3 construction qualifications
    • bse systems
    • plumbing revision podcast
    • pressure
    • gas
    • plumbing apprentices


    Hosted on Acast. See acast.com/privacy for more information.

    続きを読む 一部表示
    25 分
  • Water In, Waste Out — Cold Water Systems & Sanitary Appliances for Plumbing Apprentices | Unit 307 Phase 2
    2026/07/12

    The Copper Connection Podcast – Season 2, Episode 76, Water In, Waste Out — Cold Water Systems & Sanitary Appliances for Plumbing Apprentices | Unit 307 Phase 2


    Phase 2 of your plumbing apprenticeship is where theory meets real installations. And cold water systems are where a lot of learners either click — or come unstuck.


    In this episode, host Chris Bailey takes you through the complete cold water systems and sanitary appliances content for Unit 307 of the 9289 City & Guilds Level 3 Diploma in Plumbing and Domestic Heating.


    This is Session 1 of the Unit 307 Phase 2 deep-dive — and it starts with a question every apprentice should be able to answer: what's the actual difference between a direct and indirect cold water system, and why does it change every installation decision you make?


    Chris covers:

    ✅ Direct cold water systems — how they work, pressure, pipe sizes, advantages and disadvantages

    ✅ Indirect cold water systems — CWSC capacity, pipe sizes (including the 22mm bath feed rule), pros and cons

    ✅ Hard water and water treatment — magnetic conditioners, water softeners, drinking water filters

    ✅ Sanitary appliance materials — vitreous china, acrylic, stainless steel, fireclay, cast iron, pressed steel

    ✅ Baths — all six types, BS 4304, AUK2 air gap, 22mm feeds, 40mm waste, combination waste fittings

    ✅ Shower trays and cubicles — wet rooms, unslotted waste, feed pipe sizing

    ✅ WCs — washdown, siphonic, close-coupled to wall-hung, flush volumes from 9L to today's 4/6L dual flush

    ✅ Urinals — bowl, trough, slab, sparge pipe, automatic flushing cisterns, waterless urinals, Water Regs volumes

    ✅ Bidets — over-rim vs ascending spray, the AUK2 air gap rule, why ascending spray MUST be cistern-fed

    ✅ Valves — stop valves, gate valves, FOVs (BS 1212 Parts 1–4), drain-off valves, spherical plug valves

    ✅ Building Regulations Part G — 125 litres per person per day, water efficiency calculations


    This episode is essential listening for:

    — Plumbing apprentices on the ST0303 Level 3 standard working through Phase 2

    — Level 2 Plumbing students progressing to Level 3

    — T-Level Building Services Engineering learners (Year 1 and Year 2)

    — Anyone revising for the 9289-021 Phase 2 multiple choice exam


    Plain English. Real trade context. No fluff.


    cold water systems plumbing, direct indirect cold water system, unit 307 9289, phase 2 plumbing apprentice, sanitary appliances plumbing, AUK2 air gap, bidet water regulations, WC flush volumes, urinal water regulations, bath installation plumbing, float operated valve BS 1212, water supply water fittings regulations, building regulations part G, city and guilds level 3 plumbing, 9289-021 exam revision, ST0303 apprenticeship, T-Level building services engineering, copper connection podcast, Chris Bailey plumbing podcast, plumbing revision UK

    • unit 307 phase 2
    • 9289 domestic plumbing and heating
    • 9289 phase 2
    • cold water systems in plumbing
    • cold water systems
    • sanitary appliances
    • plumbing revision sanitation
    • sanitation and drainage masterclass
    • sanitation and drainage exam prep
    • exam preparation for plumbing
    • uk plumbing exams
    • uk plumbing revision
    • technical qualifications uk
    • plumbing study resources


    Hosted on Acast. See acast.com/privacy for more information.

    続きを読む 一部表示
    29 分