  • #114 – Why a Year Late on Brownfield CBTC Is a Good Result, with Mike Palmer
    2026/09/23

    A brownfield CBTC project that lands a year late is a good result. Not a consolation prize. That is what the record actually looks like once you take the press releases out of it.

    Mike Palmer spent 29 years at London Underground, finishing as the user acceptance manager on the Jubilee and Northern line upgrades, where every operational decision on scope and functionality went through him and nobody else. He then crossed to the supplier side, and in 2014 Andy Byford brought him to the Toronto Transit Commission as Deputy Chief Operating Officer and later COO. He now works at Parsons. This conversation was recorded in 2024, and Mike speaks throughout in a personal capacity rather than for any employer or agency.

    In this episode: why eight contracts across three suppliers left Toronto Line 1 with no endgame, and what consolidating them to two actually fixed. Why he does not want a fully compliant bid, and what he asks for instead. What a reference site is worth, and why he flew his team to Mexico City and Panama to touch the system before committing. Why backup signalling so often buys risk instead of resilience. Why dwell times, turnbacks and traction power queue up behind signalling and take away the capacity you just paid for. And his top three golden rules for brownfield CBTC, with the same one at number one every time.

    If you get something out of it, tell a colleague. That is the only ask.

    If this conversation has got you wanting to go deeper, visit my training platform at www.docfranktraining.com. There you find the most comprehensive suite of online courses in advanced railway signalling anywhere. CBTC, ETCS, high capacity signalling, and more. All in one place, all vendor neutral. Check out my latest course addition, ETCS for Australia.

    続きを読む 一部表示
    1 時間 12 分
  • #113 – Why ETCS Is a Change Program, Not a Tech Project, with Cara Cohen
    2026/09/09

    Fit the locomotives, commission the trackside, write the rules, and ETCS can still stumble on the day a driver decides the old way was better. The technology is the measurable part of an ETCS introduction. The people are the program.

    My guest Cara Cohen is an organisational psychologist who worked on business change for the introduction of ETCS at UK freight operator Freightliner, inside the East Coast Digital Programme. This conversation was recorded during her time there; she has since moved to the Rail Delivery Group as People, Change and Projects Specialist for ETCS, so the people side of this rollout continues to be her day job.

    We get into what a business change manager actually does, why drivers hesitate to trust the screen and what wins them over, how Level NTC works and why most freight drivers meet it before they ever meet Level 2, why a fitted locomotive is treated as new traction, and the quiet disciplines that keep a change program alive: bite-sized learnings, myth busting, and unions involved from the first human factors session. The conversation closes with Freightliner's decision to take its first-in-class fitment in-house, in partnership with Siemens.

    If you find this useful, share it with a colleague.

    For the best way to truly understand ETCS, CBTC and high capacity signalling, all vendor neutral, visit www.docfranktraining.com. New course addition: ETCS for Australia.

    続きを読む 一部表示
    1 時間 2 分
  • #112 – Why More Review Comments Make Railways Less Safe, with Andy Petrie
    2026/08/26

    Twenty people comment on a document. Nineteen of them have no expertise in it. Every comment has to be answered, and the two that mattered get lost in the noise. Andy Petrie has spent thirty years watching this happen and has stopped being polite about it.

    Andy is Director of Systems and Safety Assurance at ARCH in Sydney, with thirty years across rail, nuclear, oil and gas, and major civils. He has been Lead Independent Safety Assessor on Melbourne's Metro Tunnel, Director of Safety and Engineering Systems at Transport for NSW, and Head of Safety and Assurance for Network Rail Consulting in Australia. His stated mission is to cut the BS.

    In this conversation he sets out four stages of assurance. Value for money, where risk-based assessment confirms the work is good enough and you stop. Chasing perfect, where you push for more than you paid for. Admin overload, where twenty people comment on a document and nineteen have no expertise in it. And crossing the line, where the client starts instructing the designer and quietly takes back the liability they paid someone else to carry.

    We also get into why assessing a document is not the same as reviewing it, why "no comments" is the hardest review to write, and what happens to signalling design responsibility when the technology becomes a black box. The conversation closes on Australian interoperability and whether a single national standard is the answer, or whether the answer sits on the train.

    If you find this useful, share it with a colleague.

    For the best way to truly understand ETCS, CBTC and high capacity signalling, all vendor neutral, visit www.docfranktraining.com. New course addition from 1 September 2026: ETCS for Australia.