『NKT: Beating the (cable) drum for a green grid』のカバーアート

NKT: Beating the (cable) drum for a green grid

NKT: Beating the (cable) drum for a green grid

無料で聴く

ポッドキャストの詳細を見る

今ならプレミアムプランが3カ月 月額99円

2026年5月12日まで。4か月目以降は月額1,500円で自動更新します。

概要

In this episode we visit cable manufacturer NKT at their factory in Asnæs, Denmark, where giant cable drums lie coiled with the infrastructure of the future.

While wind turbines and electric vehicles often steal the spotlight of the green transition, none of them would function without one thing: cables.

Want more from State of Green?

https://stateofgreen.com/en/news/

adbl_web_anon_alc_button_suppression_c
まだレビューはありません