『MISO President and CEO Discusses Large Load Growth, Details How MISO is Preparing to Meet Summer Power Demand』のカバーアート

MISO President and CEO Discusses Large Load Growth, Details How MISO is Preparing to Meet Summer Power Demand

MISO President and CEO Discusses Large Load Growth, Details How MISO is Preparing to Meet Summer Power Demand

無料で聴く

ポッドキャストの詳細を見る

今ならプレミアムプランが3カ月 月額99円

2026年5月12日まで。4か月目以降は月額1,500円で自動更新します。

概要

In the latest episode of Public Power Now, John Bear, President and CEO of the Midcontinent ISO, discusses how MISO is planning for large load growth, details how the grid operator is preparing to meet summer power demand this year and provides an overview of MISO’s long range transmission planning efforts.

まだレビューはありません