『Record PPA Prices, GE Tries to Exit Vineyard』のカバーアート

Record PPA Prices, GE Tries to Exit Vineyard

Record PPA Prices, GE Tries to Exit Vineyard

無料で聴く

ポッドキャストの詳細を見る

今ならプレミアムプランが3カ月 月額99円

2026年5月12日まで。4か月目以降は月額1,500円で自動更新します。

概要

US wind PPA prices climb to $79.40/MWh as the IRA sunsets. Plus GE Vernova ordered to stay at Vineyard Wind, lessons from Spain’s blackout, and data centers straining the US grid. Sign up now for Uptime Tech News, our weekly newsletter on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on YouTube, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary’s “Engineering with Rosie” YouTube channel here. Have a question we can answer on the show? Email us! The Uptime Wind Energy Podcast brought to you by Strike Tape protecting thousands of wind turbines from lightning damage worldwide. Visit strike tape.com and now your hosts. Allen Hall: Welcome to the Uptime Wind Energy Podcast. I’m your host, Allen Hall here with Nikki Briggs, who is in North Carolina this week, and Yolanda Padron who is back from the exciting wedding and weekend in Mexico. Welcome back, Yolanda. Yolanda Padron: Thank you. Excited to be here, Allen Hall: uh, this week there’s a, there’s a lot going on and we’re gonna touch upon some of it. Uh, Rosemary is over in China this week and Matthew is actually at Wind Europe in Madrid. And so this is gonna be an American focused episode mostly, but it’s gonna have global implications. One of the key items is PPA prices in the United States and with the on sunsetting of the [00:01:00] IRA Bills, uh, tax credits, and the whole infrastructure there with the one big beautiful bill when it crushed the IRA bill. PPA Prices needed to come up well. That’s happening, right? So developers, uh, can’t live without some money to compensate for the roughly 26, 26 7 20 $7 in PPA prices that were compensated by the tax credits. But, uh, when purchase price agreements have hit the highest level since they begin tracking it at Wood Mac. The average wind PPA now stands at $79 and 40 cents per megawatt hour up 24% from just one year ago now, Yolanda, you and I were talking before we started recording today about how low some of those PPA prices were two years ago, three years ago. Some of them were almost single digits. Yolanda Padron: Yeah, yeah. Some of them were pretty low. I [00:02:00] remember 16, $19 EPA prices and then a couple years ago we were looking at those and thinking, oh no, I can’t believe we, we kept those prices and they’re so low and everything’s changed so much, and the prices grown so much, and that was two years ago and now it’s, it’s, it’s, it’s almost four times as much as, as what we had originally thought, which is. Not super great for those older projects, Allen Hall: obviously, uh, when they, if they do repower, the extent they’re gonna have to renegotiate the PPAs. Right. The, the landscape has changed quite a bit. So the, the question really is now are they gonna be able to renegotiate new PPAs when the existing PPA hopefully ends? You can’t, you can’t run turbines for free and will they repower. Or will they just try to extend the lifetime? I think it’s a lot of operators trying to figure that out right now. And that’s in light of installations. So Whim Mac also says that US wind installations are [00:03:00] on track to nearly double in 2026, uh, building towards 48 gigawatts of new capacity through 2030, which all makes sense, right? That the, the. Uh, everybody’s trying to get all their assets in the ground so they, they qualify for the, the tax credits. So there’s a big push. So 2026 and 2027 are gonna be pretty busy years. Uh, but the, the negotiations are still going on and we’re talking to operators. Nikki and I have been talking to operators this past week or the last couple of weeks, honestly. There is all kinds of negotiations going on for turbines right now and who can get turbines? Can they get ’em in time? Can they get ’em planted fast enough? Nikki, it is causing a lot of operators to spend a great deal of time doing planning that they otherwise wouldn’t have been working on two years ago. Nikki Briggs: Definitely. I mean, it seems kind of weird to me because it’s like a weird spot. It’s like, um, you know, we want more power and we need to do all these projects, [00:04:00] but then. The permitting process is just like a brick wall or something, you know? Um, like it just takes them so much more to get through, um, and get it moving. Allen Hall: Well, I, I think if you have an existing site, you’re gonna repower it. I mean, that’s probably the easiest thing to do if, if you can pull it off. The, the question is how big of a turbine are you gonna purchase? A lot of those turbines that are gonna get repowered are probably 1.5. To two megawatt machines. They’re going to move up to five or six megawatt machines, generally speaking. So they’re reducing the amount of turbines that are gonna be on site. But the, the amount of power that...
まだレビューはありません