『Tilt Renewables’ Dr. Liz Beavis on Wind O&M in Australia』のカバーアート

Tilt Renewables’ Dr. Liz Beavis on Wind O&M in Australia

Tilt Renewables’ Dr. Liz Beavis on Wind O&M in Australia

無料で聴く

ポッドキャストの詳細を見る

今ならプレミアムプランが3カ月 月額99円

2026年5月12日まで。4か月目以降は月額1,500円で自動更新します。

概要

Dr. Liz Beavis, Asset Manager at Tilt Renewables, joins to discuss O&M contracts, balance of plant, and lessons from Australia’s biggest and oldest wind farms. Contact Liz on LinkedIn or by email. Sign up now for Uptime Tech News, our weekly newsletter on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on YouTube, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary’s “Engineering with Rosie” YouTube channel here. Have a question we can answer on the show? Email us! Intro: [00:00:00] Welcome to Uptime Spotlight, shining Light on Wind. Energy’s brightest innovators. This is the Progress Powering tomorrow. Allen Hall: Liz, welcome to the program. Thanks, Liz Beavis: Alan. I feel I’m a long time listener. First time caller, so it’s exciting. Allen Hall: You are a long time listener and thanks for doing that. Uh, and Liz, I just find you to be a wealth of knowledge and, uh, we met on a couple occasions since I’ve been in Australia and it’s just, uh, a fun to connect here because I think a lot of the things that are happening in Australia need to be spread around the world. A lot of, uh, good o and m practices happening in Australia, uh, from hard lessons learned. So that’s what I want to dive into today. And then the first one is, I don’t think many people realize this, that you went. From commissioning, Australia’s largest wind farm, Cooper’s gap to managing seven [00:01:00] of the 10 oldest operational wind farms in the country. So you got some of the biggest, newest to some of the oldest assets. Uh. Uh, my question is like, when you started that, did you just kind of assume like wind, wind farms or wind farms or wind turbines or wind turbines and you could just basically own and end them the same, or do, or did it just occur to you immediately like, I need to take a different plan of attack here? Liz Beavis: I think I, I knew nothing about wind farms when I turned up at Cooper’s Gap, so, so yeah, I got my, well, okay, we’ll go right back to the start. So I was working at a thermal power station and I was just thinking. There’s no future in coal. How do I get into renewables? And then a wind farm got built like 50 kilometers from my house. I can, I can see it in the horizon. Um, and I thought, oh, they’re not gonna need a chemical engineer there, but I wonder if they need a site manager or something. And then the site manager role came up, I applied for it. So the services site manager. So, [00:02:00] um. That was July, 2020. That’s when I first started listening to the podcast. ’cause I thought I better find out something about this industry before I do my job interview. And so I’ve been listening ever since. But, um, yeah, so I don’t know. I was just lucky to get that role. And I turned up and, um, I think it was the end of September, 2020 first time I’d ever set foot on a wind farm ’cause of COVID and everything. I didn’t, I didn’t go there for the interview. My manager was in Thailand. I just turned up. And, um, so they, they’d finished construc, they’d built all the towers where they hadn’t finished commissioning. And so we’re still working out of construction, dongas, you know, temporary buildings and um, and there was hundreds of people on site and it was just the absolute chaos of. Constructing a two hundred, a hundred and twenty three turbines. You know, like there’s just people everywhere. And I thought, wow, I’ve just gotta figure out what I’m supposed to be doing here. There were a few technicians. I found out how many technicians I supposed to have. Just started recruiting, started figuring out what I was supposed to be doing there, and I just [00:03:00] learned so much. In the two years we took over the new r and m building. We had failed gear, boxes, generators, transformers, overhead line, underground line, pretty much. Anything that could fail failed, and I got to see what we needed to do. Um, but through all of that, I was also thinking, oh, how do I manage this wind farm better? I don’t know anything about wind farms, and I’m reaching out to the other GE sites, but the, the next biggest site was 75 turbines, and all of the rest of them are 30 and 40. So they’re saying to me, oh, you just get a team to go around. And I’m thinking. Well, that’s six weeks of work. You know, like, like everything is so much bigger on a bigger wind farm. And then I’d reach out to the, the American sites. That had big wind farms, but their contracts were so different, and I didn’t understand at first, I started to realize, well, their contracts are completely different and their focus is different, and so they’re not facing the same issues that I’m facing. Um, and then, you know, even speaking to a wind farm in [00:04:00] Sweden that was a similar size, but...
まだレビューはありません